Objective: to reach a value of 1 to 3 millions of dollars parts from parts previously classified as Non Repairable in a reference period (2008).
The results: 1.857 million of dollars from parts had been got for Snecma in 6 months.
(Congratulations from the director of the site).
2 Projects: a high level evaluation study for the installation of deep water PIP flowlines
and a preliminary analysis of a drilling system in Kenya.
Objective: make the study and the analysis with the objective to reduce the costs of installations and components (cost killer)
evening, week-end and holidays employment: Pierre Cardin adviser, development of the hotel business, Hotel organisation manager, Organisation of seminary (for businessmen), Budget and Team Management for Special Events like the “Soccer Golden Ball Award†in 2005 and some culture event.
Ecole Superieure de Commerce de Toulouse, one of the most famous school in France
Toulouse, France
Grade/GPA: 80%
The school is: EQUIS, AACSB and AMBA accreditated.
Course undertaken include: Entrepreneurial Strategy, Team Management, Marketing B2B and Marketing plan, Entrepreneurial Finance, Business Plan, Market Studies, Team managememt, Sell Strategy.
Major in Aeronautical Systems Design.
* Industrial and Research Project (5th year): Subject: An upgrade of the capacity of the AIRBUS A380 to 1000 seats.
* Industrial Research Project (4th year): Subject: Conception and Design of an interception aircraft(prototype) of type F-22 Raptor.
English course undertaken include: a 2 month course at the “Phoenix Academy†school in Perth (Western Australia) and a 1 month course in “La Trobe University†from Melbourne where I took the TOEIC exam (Test of English for International Communication).
(Score: 825 out of 990).